Hardware Step-by-Step
Remove the fast-exchange plate
- Lower the Z axis all to the minimum.
- Remove the fast exchange attachment from the Z-Axis by loosening the 4 screws holding it.
The upper drive will be directly fixed to the Z stage without the fast exchange attachment.
Install the Fz load cell
Specification
SPN Number | Range (kN) | Application Test |
AM000467-00 | 5 | ㅤ |
AM000467-01 | 8 | 4Ball |
AM000467-02 | 10 | ㅤ |
Upper Rotary Drive with integrated 20 Nm Torque sensors | Part no. |
Speed 0.1 to 5,000 rpm; Max Torque 5.3 Nm 5.1Nm @500rpm, 4 Nm @3000rpm, 2.9Nm @5000rpm, Integrated Torque Sensor Range 20 Nm, Additional torque sensor range upon request | SPN04004-2-5000-20 |
Standard Config Speed 0.1 to 2,500 rpm; Max Torque 11.2 Nm 10.4Nm @500rpm, 9.5Nm @1000rpm, 6 Nm @2500rpm Integrated Torque Sensor Range 20 Nm, additional torque sensor range upon request | SPN04004-2-2500-20 |
TappingTorque | ㅤ |
Speed 0.1 to 5,000 rpm; Max Torque 5.3 Nm 5.1Nm @500rpm, 4 Nm @3000rpm, 2.9Nm @5000rpm, Integrated Torque Sensor Range 20 Nm, Additional torque sensor range upon request. Lower liquid collecting pan 10"x7" | SPN04005 |
- Position the load cell in contact with the Z Stage direct support.
- While holding it in place, fasten the 4 captive screws as shown below.
The 4-pin holder of the Fz load cell must face downwards.
The slot connector of the load cell must be pointing to the right.
Slide in the upper drive
- Slide the upper drive into the load cell pins.
Please pay attention to the notch, circled in orange, which must point towards the back.
After sliding it in, the upper rotary drive is now supported by the 4-pins.
- To secure the upper drive, tighten the 3 captives screws using a 5/32" Allen key.
There is only one captive screw on the right.
Connect the cables
Connect the Electrified testing cables {{if ev}}
Upper Electric EV rotary drive with 8000N quad force sensor and integrated torque sensor - SPN04332
Mount the self-adjusting heating platform
Mount the cooled self-adjusting platform [cool]
Mount the self-adjusting platform [none]
Assembling the 4ball oil container [liq]
- Empty the container and pull out the thermocouple probe.
Cleaning procedure before test
- Immerse container components and balls in Stoddard solvent, swirl or ultrasonically clean for 5 minutes.
- Transfer to fresh Stoddard solvent, swirl or ultrasonically clean for 1 minute.
- Rinse in n-heptane, swirl or ultrasonically clean 1–2 minutes.
- Air-dry 10 minutes in fume hood or warm air stream.
- Assemble immediately into the test cup using clean tweezers.
- Insert the three balls into the empty container, without forgetting the positioning pin.
The thermocouple probe must be pushed close to the balls.
- Put the clamping rings. Make sure the clamping ring with the 3 notches faces towards the ball (opposite from the picture). Then the chuck insert above.
- Finally, put the nut.
For Oil Preparation
Pour the oil to be evaluated into the test-oil cup to a level around 3 mm above the top of the balls. Ensure that this oil level still exists after the test-oil fills all of the voids in the test-oil cup assembly.
Assembling the 4ball EV oil container [liq&(ev,elec]
For Oil Preparation
Pour the oil to be evaluated into the test-oil cup to a level around 3 mm above the top of the balls. Ensure that this oil level still exists after the test-oil fills all of the voids in the test-oil cup assembly.
Assembling the 4ball grease container [room]
- Empty the container and pull out the thermocouple probe.
- Immerse balls in Stoddard solvent, ultrasonically clean for 5 min.
- Transfer to fresh Stoddard solvent, swirl for 1 min.
- Rinse in n-heptane, swirl or ultrasonically clean 1–2 min.
- Air-dry 10 min in fume hood or warm air stream.
- Assemble immediately into the test cup using clean tweezers.
Cleaning procedure before test
- Insert the grease container and the positioning pin.
Insert back the thermocouple probe.
This pin prevents the ball from slipping during testing.
- Put the circular insert ,then place the 3 testing balls.
Make sure that the thermocouple probe is pushed very close to the balls.
- Put the clamping ring in place, then insert the chuck.
Assembling the 4ball EV grease container [liq&(ev,elec)]
Tighten the 4ball container to 50 ft-lbf (67.8 N.m)
- Take the provided torque wrench and adjust it to 50 ft-lbs (67.8 N.m). Place the 6 Point Impact Socket 2-1/4” on the torque wrench.
- Place the 4ball container on the attachment table by respecting the correct orientation (different pin diameters).
- Tighten the 4ball container on the attachment table using the torque wrench.
The torque tightening is carried out according to ASTM standards, and has a direct impact on the friction outcome, including the welding process.
After use, the torque wrench should be stored at its minimal torque value (10 ft.lbf / 13.6N.m)
Install the 4ball container on the platform
- Align the two guide pins on the self-centering platform with the corresponding holes on the bottom of the sample holder.
The two keyed pins are of different diameters, ensuring correct orientation.
Hardware Final Notes
- Always confirm all screws are hand-tightened and then secured with the appropriate Allen key.
- Refer to the full user manual for safety precautions and maintenance schedules
Contact & Support
For technical support or further assistance, please contact:
Rtec-Instruments Support
support@rtec-instruments.com
+1 (408) 708-9226
Manual Versions
Manual Version | Date | Update Description |
2025-AS-01A-EN | 09/2025 | Initial Manual Version |