Required Tools and Components
Step-by-Step Installation
Remove the current adapter and holder if present
Install the adapter plate
- Position the rectangular plate along the Y axis of the load cell to support the module.
6-32 x .250” long using 7/64” Allen wrench
Install the Y axis module
- Firstly, lose the tightening screw on the right to free the upper plate and have access to each screws.
- Move the upper plate to 40mm and re tighten the side screw.
- Secure the upper module with 4 x M4 x 8 screws using a 3mm metric Allen key.
- Move back the plate to thighten the 2 last screws.
(4).gif)
Install the graphite plate and the holder
- Fix the second adapter with four 6-32 x .400” screws using a 3mm metric Allen key.
- Secure the graphite plate with four 6-32 x .250” screws long using 7/64” Allen wrench.
- Tighten the two captive screws from the suspension using 9/64” Allen key.
Without suspension
- Mount the graphite plate
- Fix the holder with 4 x 10-32 x .438” using 5/32” Allen wrench
(5).gif)
Center the holder to 0
Pin/Ball holder preparation
The ball holder along with the provided collet can also accommodate circular pins.
- Loosen the nut to free the ball.
- Insert the adjusting pin into the holder, then the ball.
Provided for standard test: Ball, .250" (1/4") (6.350mm) Dia
E52100 100Cr6 grade 25 Alloy Steel.
- Hold the holder vertically, so the ball is resting on the pin.
Using a 1/8" Allen key, fasten the screw inside the holder to slightly push the ball.
- Once the ball is retracted enough, fasten the nut to secure it.
.gif)
For preliminary testing: The ball may be reused by rotating it to expose a unworn contact surface.
For final measurements: It is recommended to employ a new ball for each test to ensure accuracy and reproducibility.
For final measurements: It is recommended to employ a new ball for each test to ensure accuracy and reproducibility.
Extension holder
- Use the extension only in particular cases where the ball holder cannot reach the sample.
- Increasing the ball holder length can negatively affect test results, especially in reciprocating tests. Whenever possible, use the load cell extension block instead.
.gif)
(to reduce the distance towards the sample)
Universal Ball holder Overivew
1. Test Ball or Pin
Rtec balls catalog
Upper Sample Holder for 1000℃ Chamber
Upper Sample Holder for 1000℃ Chamber | Part no. |
0.5 inch ball | SPN030060-55 |
0.375 inch ball | SPN030060-54 |
0.25 inch ball | SPN030060-53 |
3 mm ball | SPN030060-56 |
6mm diameter cylinder | SPN030041-462 |
6.3mm diameter cylinder | SPN13108 |
9.5mm diameter cylinder | SPN030041-463 |
12.7mm diameter cylinder | SPN030041-464 |
15mm diameter cylinder | SPN030041-465 |
- E52100 Alloy Steel / HRC60
- 304 SSt / HRC25
- 440C SSt / HRC58
- WC Tungsten Carbide / HRC75
- SiN Silicon Nitride
- Nonporous Alumina Ceramic balls
- PTFE
Available Ball size :
- 1.6mm
- 3.9mm
- 6.3mm
- 9.5mm
- 12.7mm
5. Ball Holder
Holder Specification MSC 81197253
Collet Series | ER11 |
Shank Type | Straight |
Through Coolant | No |
Shank Diameter (Inch) | 5/8 |
Minimum Collet Capacity (Decimal Inch) | 0.0190 |
Maximum Collet Capacity (Decimal Inch) | 0.2760 |
Overall Length (Inch) | 3-1/2 |
Overall Length (Decimal Inch) | 3.5 |
Actuator Type | Wrench |
Shank Length (Decimal Inch) | 3.0300 |
Collet Nut Diameter (Decimal Inch) | 0.6200 |
For additional information or to place an order, please contact Rtec Support (contact information provided at the end of this manual).
Self-Adjusting Block holder preparation
.gif)
The self-leveling block holder will ensure proper contact during the test.
- Firstly ,loosen the 2 tightening screws using /16” Allen key.
- Slide in the block sample into the block support
Avalaible ASTM Rtec Block Catalog
ASTM: D3704, G77, G176, D2714, D3704, D2509
- Level the block sufficiently into the holder.
- Tighten the securing screws on each side.
Installing the Ball Holder
- Use four 1/4” button head screws to secure the assembly to the load cell
and tighten using a 5/32” Allen wrench.
Then Insert the slip sleeve into the sensor mount.
- Place the ball holder into the slip sleeve.
- Mount the Ball Holder onto the suspension in the same manner as onto
the load cell using a 9/64” Allen wrench.
It is recommended to install the ball holder as far as possible into the suspension while making sure that it does not hit the load cell when the suspension is fully compressed.
Mounting the Argon Sensor on MFT-2000
- Install the load cell on the fast-exchange attachment by fastening the 4 captive screws using a 5/32" Allen wrench.
- The narrow side of the fast exchange plate’s should point to the left of the front load cell as this side will fit into the back of the sliding support.
- The front of the load cell is the face showing the Rtec logo and the unit calibration sticker.
(Optional) With Extension block:
(Optional) You can also use an extension block to reduce the distance between the load cell and the lower setup.
- Mount the block extension on the exchange plate with 4 4 x 10-32 x 1.250” long screws using 5/32 Allen wrench.
- Then the adaptor plate mounted on the extension block with 4 x 10-32 x .625” long screws using 5/32 Allen wrench.
- Install the load cell on the fast-exchange attachment by fastening the 4 captive screws using a 5/32" Allen wrench.
- The narrow side of the fast exchange plate’s should point to the left of the front load cell as this side will fit into the back of the sliding support.
- The front of the load cell is the face showing the Rtec logo and the unit calibration sticker.
Installing the Argon (MFT-2000)


- Slide in the load cell into the Z stage rack.
Make sure the 4 screws above the rack are removed.
Slide the load cell with its front facing you and the connector on the right.
Slide the load cell with its front facing you and the connector on the right.
- Fasten the 4 securing screws by hands.
- Connect the ribbon cable. The connector only fit one way.
Adjust the Y Radius
Hardware Final Notes
- Always confirm all screws are hand-tightened and then secured with the appropriate Allen key.
- Refer to the full user manual for safety precautions and maintenance schedules
Contact & Support
For technical support or further assistance, please contact:
Rtec-Instruments Support
support@rtec-instruments.com
+1 (408) 708-9226
Manual Version | Date | Update Description |
ㅤ | ㅤ | Initial Manual Version |
(6).gif)